NJ Zoning Check

Montville zoning check

Enter your address to find your zone and see if your project fits. No account needed.

About these numbers

Enter a one-family lot in Montville's R-120, R-80, R-43 or R-27 zones and see, line by line, whether a house or addition meets the Township's lot, yard, height and coverage limits. The check is free.

Covers the Township of Montville's single-family zones R-120, R-80, R-43, R-27A, R-27A-PA and R-27A-RA, Morris County. Checks a new house, an addition or an attached garage.

Numbers last checked November 15, 2026 against the Township's Schedule D.

Check a different address

We send the address to New Jersey's public parcel records and public zoning maps to find your lot. Privacy

Know your zone? Leave the address blank.Detailed check for architects and contractors

What you can build in Montville

Montville has 6 single-family zones covered here: R-120, R-80, R-43, R-27A, R-27A-PA and R-27A-RA. Minimum lot sizes run from 27,000 sq ft (R-27A) to 120,000 sq ft (R-120). A house must sit 50 ft (R-80) to 60 ft (R-120) back from the street and 50 ft (R-27A) to 85 ft (R-120) from the rear lot line. Houses can be up to 35 ft tall. Building coverage limits run from 10% (R-120) to 14% (R-27A).

New house or addition

Depends on your zone. Your address will show your exact numbers.

From the street
50 to 60 ft
From each side
20 to 40 ft
From the back
50 to 85 ft
Height
35 ft
See the limits for every zone
ZoneFrontEach sideRearHeightAll buildings togetherEverything paved or built
R-120Lots of 120,000 sq ft60 ft40 ft85 ft35 ft, 2.5 stories10%20%
R-80Lots of 80,000 sq ft50 ft30 ft75 ft35 ft, 2.5 stories10%20%
R-43Lots of 43,750 sq ft50 ft25 ft75 ft35 ft, 2.5 stories12%24%
R-27ALots of 27,000 sq ft50 ft20 ft50 ft35 ft, 2.5 stories14%28%
R-27A-PALots of 80,000 sq ft50 ft30 ft75 ft35 ft, 2.5 stories10%20%
R-27A-RALots of 43,750 sq ft50 ft25 ft75 ft35 ft, 2.5 stories12%24%
  • Coverage is a share of the lot.

Standard limits for single-family lots. Corner lots and special rules can change them. Last checked November 15, 2026. Confirm with the town before you design or buy.

Montville zoning questions

What are the setbacks in Montville, NJ?

For a single-family house. Corner lots can differ.

  • R-120: 60 ft from the street, 40 ft on each side, 85 ft from the rear line.
  • R-80: 50 ft from the street, 30 ft on each side, 75 ft from the rear line.
  • R-43: 50 ft from the street, 25 ft on each side, 75 ft from the rear line.
  • R-27A: 50 ft from the street, 20 ft on each side, 50 ft from the rear line.
  • R-27A-PA: 50 ft from the street, 30 ft on each side, 75 ft from the rear line.
  • R-27A-RA: 50 ft from the street, 25 ft on each side, 75 ft from the rear line.

What is the minimum lot size in Montville?

R-120: 120,000 sq ft; R-80: 80,000 sq ft; R-43: 43,750 sq ft; R-27A: 27,000 sq ft; R-27A-PA: 80,000 sq ft; R-27A-RA: 43,750 sq ft.

How tall can a house be in Montville?

R-120: 35 ft, 2.5 stories; R-80: 35 ft, 2.5 stories; R-43: 35 ft, 2.5 stories; R-27A: 35 ft, 2.5 stories; R-27A-PA: 35 ft, 2.5 stories; R-27A-RA: 35 ft, 2.5 stories.

How much of my lot can I cover in Montville?

R-120: 10% building coverage, 20% lot coverage; R-80: 10% building coverage, 20% lot coverage; R-43: 12% building coverage, 24% lot coverage; R-27A: 14% building coverage, 28% lot coverage; R-27A-PA: 10% building coverage, 20% lot coverage; R-27A-RA: 12% building coverage, 24% lot coverage.

Can you recommend an architect in Montville?

Yes. Tell us about your project and we'll connect you with a vetted, licensed residential architect who works in Montville. It's free and there's no obligation.

We'll connect you with a vetted, licensed residential architect who works in Montville and can turn what your lot allows into drawings for your permit. Free, with no obligation.

Get a free architect referral

Zoning table for your drawings

ITEMREQUIREDEXISTINGPROPOSEDCOMPLIES

ENC = existing nonconforming condition, not increased. * = relief required.

Prepared with a calculation aid. Not a zoning determination. Confirm every requirement with the municipal zoning officer.

What this does not check

Where the numbers come from

Requirements were entered on November 15, 2026 from the Township of Montville's Chapter 230, Land Use and Development, Attachment 4, Schedule D, Schedule of Area and Bulk Requirements (Section 230-120; amended through Ordinance 2026-08, March 10, 2026), including its footnotes. Check every requirement against the current code before relying on it.

A calculation aid, not a zoning determination. Using this site means you agree to the terms of use; see also the privacy policy.

Pick a zone to startSee the table