NJ Zoning Check

Washington Twp (Warren) zoning check

Enter your address to find your zone and see if your project fits. No account needed.

About these numbers

Enter a single-family lot in Washington Township's MR, VR, R-40, R-20 or R-10 District and see, line by line, whether a house, addition or detached garage or shed meets the Township's lot, yard, height and coverage limits. The check is free.

Covers the Township of Washington's single-family zones MR, VR, R-40, R-20 and R-10, Warren County. Checks a new house, an addition, an attached garage or a detached garage, barn or shed.

Numbers last checked November 16, 2026 against the district tables of the Township's zoning chapter.

Check a different address

We send the address to New Jersey's public parcel records and public zoning maps to find your lot. Privacy

Know your zone? Leave the address blank.Detailed check for architects and contractors

What you can build in Washington Twp (Warren)

Washington Twp (Warren) has 5 single-family zones covered here: MR, VR, R-40, R-20 and R-10. Minimum lot sizes run from 10,000 sq ft (R-10) to 5 acres (MR). A house must sit 30 ft (R-10) to 75 ft (MR) back from the street and 30 ft (R-10) to 100 ft (MR) from the rear lot line. Houses can be up to 35 ft tall. Building coverage limits run from 8% (MR) to 20% (R-10).

New house or addition

Depends on your zone. Your address will show your exact numbers.

From the street
30 to 75 ft
From each side
20 to 50 ft
From the back
30 to 100 ft
Height
35 ft
See the limits for every zone
ZoneFrontEach sideRearHeightHouse coverageEverything paved or built
MRLots of 5 acres75 ft50 ft100 ft35 ft, 2.5 stories8%10%
VRLots of 4 acres75 ft50 ft100 ft35 ft, 2.5 stories10%12%
R-40Lots of 40,000 sq ft50 ft30 ft50 ft35 ft, 2.5 stories10%15%
R-20Lots of 20,000 sq ft40 ft25 ft40 ft35 ft, 2.5 stories15%20%
R-10Lots of 10,000 sq ft30 ft20 ft30 ft35 ft, 2.5 stories20%30%
  • Coverage is a share of the lot.

Sheds and detached garages have their own rules. Enter your address above to see them.

Standard limits for single-family lots. Corner lots and special rules can change them. Last checked November 16, 2026. Confirm with the town before you design or buy.

Washington Twp (Warren) zoning questions

What are the setbacks in Washington Twp (Warren), NJ?

For a single-family house. Corner lots can differ.

  • MR: 75 ft from the street, 50 ft on each side, 100 ft from the rear line.
  • VR: 75 ft from the street, 50 ft on each side, 100 ft from the rear line.
  • R-40: 50 ft from the street, 30 ft on each side, 50 ft from the rear line.
  • R-20: 40 ft from the street, 25 ft on each side, 40 ft from the rear line.
  • R-10: 30 ft from the street, 20 ft on each side, 30 ft from the rear line.

What is the minimum lot size in Washington Twp (Warren)?

MR: 5 acres; VR: 4 acres; R-40: 40,000 sq ft; R-20: 20,000 sq ft; R-10: 10,000 sq ft.

How tall can a house be in Washington Twp (Warren)?

MR: 35 ft, 2.5 stories; VR: 35 ft, 2.5 stories; R-40: 35 ft, 2.5 stories; R-20: 35 ft, 2.5 stories; R-10: 35 ft, 2.5 stories.

How much of my lot can I cover in Washington Twp (Warren)?

MR: 8% building coverage, 10% lot coverage; VR: 10% building coverage, 12% lot coverage; R-40: 10% building coverage, 15% lot coverage; R-20: 15% building coverage, 20% lot coverage; R-10: 20% building coverage, 30% lot coverage.

Can you recommend an architect in Washington Twp (Warren)?

Yes. Tell us about your project and we'll connect you with a vetted, licensed residential architect who works in Washington Twp (Warren). It's free and there's no obligation.

We'll connect you with a vetted, licensed residential architect who works in Washington Twp (Warren) and can turn what your lot allows into drawings for your permit. Free, with no obligation.

Get a free architect referral

Zoning table for your drawings

ITEMREQUIREDEXISTINGPROPOSEDCOMPLIES

ENC = existing nonconforming condition, not increased. * = relief required.

Prepared with a calculation aid. Not a zoning determination. Confirm every requirement with the municipal zoning officer.

What this does not check

Where the numbers come from

Requirements were entered on November 16, 2026 from the Township of Washington's Chapter 123, Zoning, Sections 123-11, 123-12 and 123-15. Check every requirement against the current code before relying on it.

A calculation aid, not a zoning determination. Using this site means you agree to the terms of use; see also the privacy policy.

Pick a zone to startSee the table