NJ Zoning Check

Greenwich (Warren) zoning check

Enter your address to find your zone and see if your project fits. No account needed.

About these numbers

Enter a lot with a single-family house in Greenwich Township (Warren County)'s R-5, R-2, R-1, R-75 or PD zone and see, line by line, whether a house, addition or detached garage meets the Township's lot, yard, height and impervious coverage limits.

Covers the Township of Greenwich's single-family zones R-5, R-2, R-1, R-75 and PD, Warren County. Checks a new house, an addition, an attached garage or a detached garage or shed.

Numbers last checked November 16, 2026 against the Township's Chapter 16, Attachment 5 and Section 16-5.1.

Check a different address

We send the address to New Jersey's public parcel records and public zoning maps to find your lot. Privacy

Know your zone? Leave the address blank.Detailed check for architects and contractors

What you can build in Greenwich (Warren)

Greenwich (Warren) has 5 single-family zones covered here: R-5, R-2, R-1, R-75 and PD. Minimum lot sizes run from 7,500 sq ft (R-75) to 5 acres (R-5) in most zones. A house must sit 25 ft (R-75) to 75 ft (R-5) back from the street and 35 ft (R-75) to 100 ft (R-5) from the rear lot line. Houses can be up to 35 ft tall. Lot coverage limits run from 5% (R-5) to 75% (PD).

New house or addition

Depends on your zone. Your address will show your exact numbers.

From the street
25 to 75 ft
From each side
10 to 75 ft
From the back
35 to 100 ft
Height
35 ft
See the limits for every zone
ZoneFrontEach sideRearHeightEverything paved or built
R-5Lots of 5 acres75 ft75 ft100 ft35 ft, 2.5 stories5%
R-275 ft40 ft100 ft35 ft, 2.5 stories10%
R-1Lots of 40,250 sq ft50 ft30 ft50 ft35 ft, 2.5 stories15%
R-75Lots of 7,500 sq ft25 ft10 ft35 ft35 ft, 2.5 stories20%
PDLots of 13,000 sq ft30 ft10 ft, 25 ft total40 ft35 ft, 2.5 stories75%
  • Coverage is a share of the lot.

Sheds and detached garages have their own rules. Enter your address above to see them.

Standard limits for single-family lots. Corner lots and special rules can change them. Last checked November 16, 2026. Confirm with the town before you design or buy.

Greenwich (Warren) zoning questions

What are the setbacks in Greenwich (Warren), NJ?

For a single-family house. Corner lots can differ.

  • R-5: 75 ft from the street, 75 ft on each side, 100 ft from the rear line.
  • R-2: 75 ft from the street, 40 ft on each side, 100 ft from the rear line.
  • R-1: 50 ft from the street, 30 ft on each side, 50 ft from the rear line.
  • R-75: 25 ft from the street, 10 ft on each side, 35 ft from the rear line.
  • PD: 30 ft from the street, 10 ft on each side (25 ft in total), 40 ft from the rear line.

What is the minimum lot size in Greenwich (Warren)?

R-5: 5 acres; R-1: 40,250 sq ft; R-75: 7,500 sq ft; PD: 13,000 sq ft. In the other zones it depends on the lot.

How tall can a house be in Greenwich (Warren)?

R-5: 35 ft, 2.5 stories; R-2: 35 ft, 2.5 stories; R-1: 35 ft, 2.5 stories; R-75: 35 ft, 2.5 stories; PD: 35 ft, 2.5 stories.

How much of my lot can I cover in Greenwich (Warren)?

R-5: 5% lot coverage; R-2: 10% lot coverage; R-1: 15% lot coverage; R-75: 20% lot coverage; PD: 75% lot coverage.

Can you recommend an architect in Greenwich (Warren)?

Yes. Tell us about your project and we'll connect you with a vetted, licensed residential architect who works in Greenwich (Warren). It's free and there's no obligation.

We'll connect you with a vetted, licensed residential architect who works in Greenwich (Warren) and can turn what your lot allows into drawings for your permit. Free, with no obligation.

Get a free architect referral

Zoning table for your drawings

ITEMREQUIREDEXISTINGPROPOSEDCOMPLIES

ENC = existing nonconforming condition, not increased. * = relief required.

Prepared with a calculation aid. Not a zoning determination. Confirm every requirement with the municipal zoning officer.

What this does not check

Where the numbers come from

Requirements were entered on November 16, 2026 from the Township of Greenwich's Chapter 16, Attachment 5 (Schedule of Area, Yard and Building Requirements) and Section 16-5.1. Check every requirement against the current code before relying on it.

A calculation aid, not a zoning determination. Using this site means you agree to the terms of use; see also the privacy policy.

Pick a zone to startSee the table