NJ Zoning Check

Hopewell (Cumberland) zoning check

Enter your address to find your zone and see if your project fits. No account needed.

About these numbers

Enter a single-family lot in Hopewell Township's A, R-1, R-2, R-3 or V zone and see, line by line, whether a house, addition, detached garage or shed meets the Township's lot, yard, height and coverage limits.

Covers the Township of Hopewell's single-family zones A, R-1, R-2, R-3 and V, Cumberland County. Checks a new house, an addition or an attached garage.

Numbers last checked November 15, 2026 against the Township's Schedule A.

Check a different address

We send the address to New Jersey's public parcel records and public zoning maps to find your lot. Privacy

Know your zone? Leave the address blank.Detailed check for architects and contractors

What you can build in Hopewell (Cumberland)

Hopewell (Cumberland) has 5 single-family zones covered here: A, R-1, R-2, R-3 and V. Minimum lot sizes run from 30,000 sq ft (V) to 65,340 sq ft (A) in most zones. A house must sit 15 ft (V) to 100 ft (A) back from the street and 25 ft (V) to 50 ft (A) from the rear lot line. Houses can be up to 35 ft tall. Building coverage limits run from 15% (A) to 30% (R-3).

New house or addition

Depends on your zone. Your address will show your exact numbers.

From the street
15 to 100 ft
From each side
15 to 25 ft
From the back
25 to 50 ft
Height
35 ft
See the limits for every zone
ZoneFrontEach sideRearHeightEverything built on the lot
ALots of 65,340 sq ft100 ft25 ft50 ft35 ft15%
R-1Lots of 65,340 sq ft50 ft25 ft50 ft35 ft20%
R-240 ft20 ft40 ft35 ft25%
R-3Lots of 32,670 sq ft40 ft20 ft40 ft35 ft30%
VLots of 30,000 sq ft15 ft15 ft25 ft35 ft30%
  • Coverage is a share of the lot.

Standard limits for single-family lots. Corner lots and special rules can change them. Last checked November 15, 2026. Confirm with the town before you design or buy.

Hopewell (Cumberland) zoning questions

What are the setbacks in Hopewell (Cumberland), NJ?

For a single-family house. Corner lots can differ.

  • A: 100 ft from the street, 25 ft on each side, 50 ft from the rear line.
  • R-1: 50 ft from the street, 25 ft on each side, 50 ft from the rear line.
  • R-2: 40 ft from the street, 20 ft on each side, 40 ft from the rear line.
  • R-3: 40 ft from the street, 20 ft on each side, 40 ft from the rear line.
  • V: 15 ft from the street, 15 ft on each side, 25 ft from the rear line.

What is the minimum lot size in Hopewell (Cumberland)?

A: 65,340 sq ft; R-1: 65,340 sq ft; R-3: 32,670 sq ft; V: 30,000 sq ft. In the other zones it depends on the lot.

How tall can a house be in Hopewell (Cumberland)?

A: 35 ft; R-1: 35 ft; R-2: 35 ft; R-3: 35 ft; V: 35 ft.

How much of my lot can I cover in Hopewell (Cumberland)?

A: 15% building coverage; R-1: 20% building coverage; R-2: 25% building coverage; R-3: 30% building coverage; V: 30% building coverage.

Can you recommend an architect in Hopewell (Cumberland)?

Yes. Tell us about your project and we'll connect you with a vetted, licensed residential architect who works in Hopewell (Cumberland). It's free and there's no obligation.

We'll connect you with a vetted, licensed residential architect who works in Hopewell (Cumberland) and can turn what your lot allows into drawings for your permit. Free, with no obligation.

Get a free architect referral

Zoning table for your drawings

ITEMREQUIREDEXISTINGPROPOSEDCOMPLIES

ENC = existing nonconforming condition, not increased. * = relief required.

Prepared with a calculation aid. Not a zoning determination. Confirm every requirement with the municipal zoning officer.

What this does not check

Where the numbers come from

Requirements were entered on November 15, 2026 from a published copy of the Township's Chapter 220, Attachment 1, Schedule A (Publication April 2022), amended by Ord. No. 11-07 (September 22, 2011) and Ord. No. 19-07 (July 18, 2019). Check every requirement against the current code before relying on it.

A calculation aid, not a zoning determination. Using this site means you agree to the terms of use; see also the privacy policy.

Pick a zone to startSee the table