NJ Zoning Check

Hopewell Township zoning check

Enter your address to find your zone and see if your project fits. No account needed.

About these numbers

Enter a conventional single-family lot in Hopewell Township's R-150, R-100, R-75 or R-50 zone and see, line by line, whether a house or addition meets the Township's lot, yard, height and coverage limits.

Covers the Township of Hopewell's single-family zones R-150, R-100, R-100 septic, R-75 and R-50, Mercer County. Checks a new house, an addition or an attached garage.

Numbers last checked November 4, 2026 against the Township's online code and bulk schedule.

Check a different address

We send the address to New Jersey's public parcel records and public zoning maps to find your lot. Privacy

Know your zone? Leave the address blank.Detailed check for architects and contractors

What you can build in Hopewell Township

Hopewell Township has 5 single-family zones covered here: R-150, R-100, R-100 septic, R-75 and R-50. Minimum lot sizes run from 6,250 sq ft (R-50) to 80,000 sq ft (R-100 septic). A house must sit 40 ft (R-75) to 75 ft (R-150) back from the street and 25 ft (R-75) to 50 ft (R-150) from the rear lot line. Houses can be up to 35 ft tall. Lot coverage limits run from 15% (R-150) to 40% (R-50).

New house or addition

Depends on your zone. Your address will show your exact numbers.

From the street
40 to 75 ft
From each side
10 to 50 ft
From the back
25 to 50 ft
Height
35 ft
See the limits for every zone
ZoneFrontEach sideRearHeightEverything built on the lot
R-150Lots of 60,000 sq ft75 ft50 ft50 ft35 ft15%
R-100Lots of 20,000 sq ft45 ft20 ft40 ft35 ft, 2 stories20%
R-100 septicLots of 80,000 sq ft75 ft40 ft50 ft35 ft, 2 stories15%
R-75Lots of 11,250 sq ft40 ft10 ft25 ft35 ft, 2 stories25%
R-50Lots of 6,250 sq ft40 ft10 ft25 ft35 ft, 2 stories40%
  • Coverage is a share of the lot.

Standard limits for single-family lots. Corner lots and special rules can change them. Last checked November 4, 2026. Confirm with the town before you design or buy.

Hopewell Township zoning questions

What are the setbacks in Hopewell Township, NJ?

For a single-family house. Corner lots can differ.

  • R-150: 75 ft from the street, 50 ft on each side, 50 ft from the rear line.
  • R-100: 45 ft from the street, 20 ft on each side, 40 ft from the rear line.
  • R-100 septic: 75 ft from the street, 40 ft on each side, 50 ft from the rear line.
  • R-75: 40 ft from the street, 10 ft on each side, 25 ft from the rear line.
  • R-50: 40 ft from the street, 10 ft on each side, 25 ft from the rear line.

What is the minimum lot size in Hopewell Township?

R-150: 60,000 sq ft; R-100: 20,000 sq ft; R-100 septic: 80,000 sq ft; R-75: 11,250 sq ft; R-50: 6,250 sq ft.

How tall can a house be in Hopewell Township?

R-150: 35 ft; R-100: 35 ft, 2 stories; R-100 septic: 35 ft, 2 stories; R-75: 35 ft, 2 stories; R-50: 35 ft, 2 stories.

How much of my lot can I cover in Hopewell Township?

R-150: 15% lot coverage; R-100: 20% lot coverage; R-100 septic: 15% lot coverage; R-75: 25% lot coverage; R-50: 40% lot coverage.

Can you recommend an architect in Hopewell Township?

Yes. Tell us about your project and we'll connect you with a vetted, licensed residential architect who works in Hopewell Township. It's free and there's no obligation.

We'll connect you with a vetted, licensed residential architect who works in Hopewell Township and can turn what your lot allows into drawings for your permit. Free, with no obligation.

Get a free architect referral

Zoning table for your drawings

ITEMREQUIREDEXISTINGPROPOSEDCOMPLIES

ENC = existing nonconforming condition, not increased. * = relief required.

Prepared with a calculation aid. Not a zoning determination. Confirm every requirement with the municipal zoning officer.

What this does not check

Where the numbers come from

Requirements were entered on November 4, 2026 from the Township's Chapter 17, Article IX, Sections 17-159i, 17-159j and 17-159k, and its Schedule of Bulk Zoning Requirements, Residential Districts, which agree. Amendments 26-1869, 26-1870, 26-1873 and 26-1880 could not be read. Check every requirement against the current code before relying on it.

A calculation aid, not a zoning determination. Using this site means you agree to the terms of use; see also the privacy policy.

Pick a zone to startSee the table