NJ Zoning Check

Glen Ridge zoning check

Enter your address to find your zone and see if your project fits. No account needed.

About these numbers

Enter a lot with a single-family house in one of Glen Ridge's residential zones and see, line by line, whether a house, addition or detached garage meets the Borough's lot, yard, height and building area limits. The check is free.

Covers the Borough of Glen Ridge's single-family zones R-1-125, R-1-100, R-1-85, R-2 and R-3, Essex County. Checks a new house, an addition, an attached garage or a detached garage or shed.

Numbers last checked November 16, 2026 against the Borough's Title 17, Sections 17.12.020 to 17.12.030.

Check a different address

We send the address to New Jersey's public parcel records and public zoning maps to find your lot. Privacy

Know your zone? Leave the address blank.Detailed check for architects and contractors

What you can build in Glen Ridge

Glen Ridge has 5 single-family zones covered here: R-1-125, R-1-100, R-1-85, R-2 and R-3. Minimum lot sizes run from 4,800 sq ft (R-3) to 10,250 sq ft (R-1-125). Houses can be up to 35 ft tall. Building coverage limits run from 20% (R-1-125) to 30% (R-2).

New house or addition

Depends on your zone. Your address will show your exact numbers.

From the street
25 to 40 ft
From each side
4 to 10 ft
From the back
Depends on your lot
Height
35 ft
See the limits for every zone
ZoneFrontEach sideRearHeightBuilding area
R-1-125Lots of 10,250 sq ft40 ft6 ft and 10 ftVaries35 ft20%
R-1-100Lots of 10,000 sq ft40 ft6 ft and 10 ftVaries35 ft20%
R-1-85Lots of 8,500 sq ft40 ft6 ft and 10 ftVaries35 ft20%
R-2Lots of 6,200 sq ft25 ft4 ft and 8 ftVaries35 ft30%
R-3Lots of 4,800 sq ft25 ft4 ft and 8 ftVaries35 ft30%
  • Varies means the limit depends on details of your lot. Check your address to see what we can work out.
  • Coverage is a share of the lot.

Sheds and detached garages have their own rules. Enter your address above to see them.

Standard limits for single-family lots. Corner lots and special rules can change them. Last checked November 16, 2026. Confirm with the town before you design or buy.

Glen Ridge zoning questions

What are the setbacks in Glen Ridge, NJ?

For a single-family house. Corner lots can differ.

  • R-1-125: 40 ft from the street, 6 ft on one side and 10 ft on the other.
  • R-1-100: 40 ft from the street, 6 ft on one side and 10 ft on the other.
  • R-1-85: 40 ft from the street, 6 ft on one side and 10 ft on the other.
  • R-2: 25 ft from the street, 4 ft on one side and 8 ft on the other.
  • R-3: 25 ft from the street, 4 ft on one side and 8 ft on the other.

What is the minimum lot size in Glen Ridge?

R-1-125: 10,250 sq ft; R-1-100: 10,000 sq ft; R-1-85: 8,500 sq ft; R-2: 6,200 sq ft; R-3: 4,800 sq ft.

How tall can a house be in Glen Ridge?

R-1-125: 35 ft; R-1-100: 35 ft; R-1-85: 35 ft; R-2: 35 ft; R-3: 35 ft.

How much of my lot can I cover in Glen Ridge?

R-1-125: 20% building coverage; R-1-100: 20% building coverage; R-1-85: 20% building coverage; R-2: 30% building coverage; R-3: 30% building coverage.

Can you recommend an architect in Glen Ridge?

Yes. Tell us about your project and we'll connect you with a vetted, licensed residential architect who works in Glen Ridge. It's free and there's no obligation.

We'll connect you with a vetted, licensed residential architect who works in Glen Ridge and can turn what your lot allows into drawings for your permit. Free, with no obligation.

Get a free architect referral

Zoning table for your drawings

ITEMREQUIREDEXISTINGPROPOSEDCOMPLIES

ENC = existing nonconforming condition, not increased. * = relief required.

Prepared with a calculation aid. Not a zoning determination. Confirm every requirement with the municipal zoning officer.

What this does not check

Where the numbers come from

Requirements were entered on November 16, 2026 from the Borough of Glen Ridge's Title 17, Zoning, Sections 17.12.020, 17.12.021, 17.12.022, 17.12.030, 17.16.020 to 17.16.040 and 17.20.020. Check every requirement against the current code before relying on it.

A calculation aid, not a zoning determination. Using this site means you agree to the terms of use; see also the privacy policy.

Pick a zone to startSee the table